L52-DF Gas Fireplace
Part No. XG0180
f i r e f e a t u r e
Installation
Top Vent Venting Runs
For the L52-DF Top Vent, there are two types of installations: A)
Through-The-Wall Installations and B) Vertical (Through-The-Roof)
Installations.
A) Through-The-Wall Installations
Before you install any venting, you must determine whether the venting
run will be acceptable. Unacceptable venting can affect the replace's
combustion.
The Venting Graph
Measure the vertical height from the replace hearth to the centre of
the termination and the horizontal run from the from the replace ue
collar to the wall ange of the termination. Plot on the Venting Graph
(Fig. 9a) with an 'X'.
If the 'X' falls on or above the top boundary of the shaded area, the
installation is acceptable.
Example A: (Acceptable Installation)
If the vertical dimension from the hearth is 84" and the horizontal run to
the wall flange of the vent termination is 36", this would be an acceptable
installation.
Example B: (Acceptable Installation)
If the vertical dimension from the hearth is 108" and the horizontal run to
the wall flange of the vent termination is 120", this would be an acceptable
installation.
Example C: (Unacceptable Installation)
If the vertical dimension from the floor of the fireplace is 48" and the
horizontal run to the wall flange of the vent termination is 108", this would
NOT be an acceptable installation.
Figure 9c. L52DF Top Vent Venting Graph
NOTES:
All dimension lengths for vertical or horizontal runs are
measured from centre of the vent pipe.
Venting runs must fall within the limits set by the venting
graph (see Figure 9a).
Available Top Vent Components
The following venting components are available for the L-Series DF
Top Vent:
5" / 8" Venting
A - Termination PTO-3 (3" Length)
PTO-3F (3" Length)
B - Stucco Kits MSR (Stucco Frame)
MOSR (Stucco Can)
BSR ( Brick Can)
C - Flex Sections PFL-1 (12" Section)
PFL-2 (24" Section)
PFL-3 (36" Section)
PFL-4 (48" Section)
D - Rigid
Sections
PEXT-1 (12" m/f Section)
PEXT-2 (24" m/f Section)
PEXT-3 (36" m/f Section)
PEXT-4 (48" m/f Section)
E - Elbows PEL-90MM (m/m 90° Elbow)
PEL-90FF (f/f 90° Elbow)
PEL-90FM (f/m 90° Elbow)
NOTES: All dimension lengths for vertical or horizontal runs are
measured from centre of the vent pipe.
Venting runs must fall within the limits set by the venting
graph (see Figure 9A).
Example 1:
For our shortest venting conguration use components A and E (see
Figure 9a).
Figure 10. Typical Top Vent installation. If the 90° elbow is installed
directly on the fireplace, for height to the center of the
termination see chart on page 3.
Important:
An inspection of the explosion relief appers and door must be
made prior to lighting the replace. This will ensure the door gas-
keting material will provide an adequate seal during operation.
B
A
C
PEL
RHS101